This job expired 14 years ago and is kept for reference.
Senior Planning Engineer - Highways/Road construction - South East
Technology Resourcing · United Kingdom (EU.UK)
Posted by Chris Woodbridge · 1 views
- Job type
- Permanent Employment
- Industry
- Roads / Tunnel / Bridge
- Region
- United Kingdom (EU.UK)
- Salary
- £45,000 - £55,000 + Package
- Closing date
- 19 Oct 2012
ROLE: SENIOR PLANNER
LOCATION: SOUTH EAST
SALARY: £45,000 - 55,000 + Package
REF: CW/TR004423
An excellent opportunity has been made available for an experienced Planning Engineer with strong background in infrastructure projects e.g. Roads, Highways, Tunnels, Rails, Bridges, etc., to join a leading International Main Contractor assigned to work for one of the regions` major Roads/Highways projects, with a value of around £50 million.
Previous experience in a site engineering (or similar) role with a main contractor that has progressed naturally into a planning and has at least 2-3 years planning experience would be highly preferential, as would a suitable qualification in Civil Engineering
This position offers a long term career prospect and promotion within is encouraged.
If you feel you would be suitable for this position and would like to discuss the opportunity further, please don't hesitate to contact me on 01483 302211.
Technology Resourcing are specialists in Planning Engineer Jobs.