This job expired 13 years ago and is kept for reference.
Planning Engineer – Site Based – South London - Gold Group Ltd
Gold Group Ltd
Posted by Matthew Lilburn · 1 views
- Job type
- Permanent Employment
- Industry
- Civil / Building / E&M
- Salary
- £40-47,000 per annum plus car or allowance, travel, pension, healthcare
- Closing date
- 9 Apr 2013
Planning Engineer – Site Based – South London
Planning Engineer is currently required by an established main contractor that operates nationally in the construction industry. They provide building solutions to public and private sector clients across a wide spectrum of sectors including commercial, education, residential, hotel and leisure and student accommodation.
The Planning Engineer will initially be responsible for a residential / student accommodation project based in South London. The Planning Engineer will be based on site and they will work closely with the site team and be responsible for maintaining the programme in Asta Powerproject.
Candidate
· 2-4 years planning experience
· Minimum of 5 years post graduate experience
· Hold a construction related qualification.
· Strong site based experience.
· Residential / Student Accommodation experience is desirable.
· Proficient in the use of Asta Powerproject.
On offer is a competitive basic salary dependent upon experience plus an attractive main contractor’s benefits package that include car or car allowance, pension, healthcare etc.
If you are seeking a new career opportunity and you would like to be considered for the above position then please forward your CV to matt.lilburn@goldgroup.co.uk or call Matt Lilburn on 01342 330 533 quoting reference 31220.
Similar jobs
- ManchesterPermanent EmploymentCivil / Building / E&M£100-130,000
- MacclesfieldPermanent EmploymentCivil / Building / E&M£95,000
- LondonPermanent EmploymentCivil / Building / E&M£120,000