Skip to content

This job expired 13 years ago and is kept for reference.

Contract or Permanent

Primavera Expedition Planner - Metro Project - Saudi Arabia

Professional Management Resources (PMR) · Saudi Arabia (AS.SA)

Posted by Denise Mason · 1 views

Job type
Contract or Permanent
Industry
Railway
Region
Saudi Arabia (AS.SA)
Closing date
18 Apr 2013

Our client is to provide Project Management Services for the design, procurement and construction of a Metro Lines Project in Saudi Arabia, including various project controls, plans, procedures, systems, EDMS (Document Control).  They are seeking a Primavera Expedition Planner responsible for the implementation of the software, and will create and maintain the Primavera Expedition / Contract Manager database. 

The Expedition Planner will perform the following tasks:

  • Control the Expedition reference system in accordance with the Communications Plan to ensure that individual issues are captured on each communication.
  • Transmit and receive all Expedition communications
  • Monitor the performance in closing out Expedition communications.
  • Prepare Expedition performance reports to ensure Expedition KPIs are met.
  • Maintenance and retrieval of the Expedition data base
  • Maintain the Expedition hard copy document library.
  • Integrate the Expedition system with the EDMS system to ensure all communications are captured on the EDMS

Requirements:

  • A minimum of 15 years’ experience
  • Will be expert-level in the use of Primavera Expedition / Contract Manager

Visas also available for Eastern nationals, ie. India, Pakistan & Philippines.

Applicants please forward your CV with details of your current location and earliest availability by email to:  info@pmr-worldjobs.co.uk Professional Management Resources Ltd, United Kingdom.  Tel:  01271-319628 Mobile: 0796-2318972

Website: www.jobsinpower.co.uk& www.pmr-worldjobs.co.uk