Skip to content

This job expired 13 years ago and is kept for reference.

Permanent Employment

Construction Planner – Site Based on £35m Project – Central London - Gold Group

Gold Group Ltd · United Kingdom (EU.UK)

Posted by Matthew Lilburn · 1 views

Job type
Permanent Employment
Industry
Civil / Building / E&M
Region
United Kingdom (EU.UK)
Salary
up to £55k plus package - car or car allowance, travel, pension, healthcare
Closing date
7 May 2013

Construction Planner – Site Based on £35m Project – Central London - Gold Group

Planning Engineer is currently required by an established main contractor that operates nationally in the construction industry. They provide building solutions to public and private sector clients across a wide spectrum of sectors including commercial, education, residential, hotel and leisure and student accommodation.

The Planning Engineer will initially be responsible for a residential / student accommodation project based in South London. The Planning Engineer will be based on site and they will work closely with the site team and be responsible for maintaining the programme in Asta Powerproject.

Candidate

·        2-4 years planning experience

·        Minimum of 5 years post graduate experience

·        Hold a construction related qualification.

·        Strong site based experience.

·        Residential / Student Accommodation experience is desirable.

·        Proficient in the use of Asta Powerproject.

On offer is a competitive basic salary dependent upon experience of up to £55k plus an attractive main contractor’s benefits package that includes car or car allowance, pension, healthcare etc.

If you are seeking a new career opportunity and you would like to be considered for the above position then please forward your CV to matt.lilburn@goldgroup.co.uk or call Matt Lilburn on 01342 330 533 quoting reference 31220.

Similar jobs

  1. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  2. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  3. LondonPermanent EmploymentCivil / Building / E&M
    £120,000