This job expired 13 years ago and is kept for reference.
URGENT – Planner or Senior Planner – Primavera P6 – London – Roads/Bridges/Civils Strctures – Rate to £400 per day – Gold Group Ltd.
Gold Group Ltd · United Kingdom (EU.UK)
Posted by Alex Westcott · 1 views
- Job type
- Contract or Permanent
- Industry
- Roads / Tunnel / Bridge
- Region
- United Kingdom (EU.UK)
- Salary
- Up to 400 per day
- Closing date
- 9 May 2013
URGENT – Planner or Senior Planner – Primavera P6 – London – Roads/Bridges/Civils Strctures – Rate to £400 per day – Gold Group Ltd.
URGENT position for an experienced planner to work on a large framework in London. This role focuses on civils structures and concrete for a bridge. The work would entail designing and building 2 large construction programmes and then carrying on the work to site at the end of the summer. This position is offering a long term contract to work on a major project for a leading contractor.
Applicants will hold:
- Minimum of 5 years planning experience with a civils contractor in the UK using Primavera P6 (this is essential)
- Relevant degree or masters in Civil Engineering is desired
- Programming, scheduling and on site planning experience
- Will be a UK resident and available to start work within 2 weeks
- Experience working as part of a team and on own initiative
- Roads/bridges/highways experience desired but not essential
- Structures experience, preferably concrete is essential
As a sweetener this contractor will offer a contract to perm option or a permanent role with a salary of up to 60k. Based on urgency, freelance is preferred.
To apply for this position, recommend a friend or obtain further information please contact Alex on 01342330535 or alex.westcott@goldgroup.co.uk.