Skip to content

This job expired 13 years ago and is kept for reference.

Contract or Permanent

URGENT – Planner or Senior Planner – Primavera P6 – London – Roads/Bridges/Civils Strctures – Rate to £400 per day – Gold Group Ltd.

Gold Group Ltd · United Kingdom (EU.UK)

Posted by Alex Westcott · 1 views

Job type
Contract or Permanent
Industry
Roads / Tunnel / Bridge
Region
United Kingdom (EU.UK)
Salary
Up to 400 per day
Closing date
28 May 2013

URGENT – Planner or Senior Planner – Primavera P6 – London – Roads/Bridges/Civils Strctures – Rate to £400 per day – Gold Group Ltd.

 

URGENT position for an experienced planner to work on a large framework in London. This role focuses on civils structures and concrete for a bridge. The work would entail designing and building 2 large construction programmes and then carrying on the work to site at the end of the summer. This position is offering a long term contract to work on a major project for a leading contractor.

 

Applicants will hold:

 

  • Minimum of 5 years planning experience with a civils contractor in the UK using Primavera P6 (this is essential)
  • Relevant degree or masters in Civil Engineering is desired
  • Programming, scheduling and on site planning experience
  • Will be a UK resident and available to start work within 2 weeks
  • Experience working as part of a team and on own initiative
  • Roads/bridges/highways experience desired but not essential
  • Structures experience, preferably concrete is essential

 

As a sweetener this contractor will offer a contract to perm option or a permanent role with a salary of up to 60k. Based on urgency, freelance is preferred.

 

To apply for this position, recommend a friend or obtain further information please contact Alex on 01342330535 or alex.westcott@goldgroup.co.uk.