Skip to content

This job expired 13 years ago and is kept for reference.

Permanent Employment

Lead Project Planner - Queen Elizabeth Class Aircraft Carrier and Type 26 Global Combat Ship (Reference: 00019107)

BAE Systems · United Kingdom (EU.UK)

Posted by admin · 1 views

Job type
Permanent Employment
Industry
Defence
Region
United Kingdom (EU.UK)
Salary
Up to £41k per annum
Closing date
19 Oct 2013

Lead Project Planner

Reference: 00019107

There are some engineering projects that will transform your career. Projects that will push the boundaries and set new standards of excellence. We can offer the chance to work on two of them: the Queen Elizabeth Class of aircraft carrier and the Type 26 Global Combat Ship.

Both are hugely complex and innovative undertakings that will form the backbone of the Royal Navy for decades to come.  And both call for a whole range of specialist skills spanning a range of functions from Project Management to Engineering.

While marine experience is clearly a plus, many of our team have brought transferrable skills from other sectors. For us, high levels of technical expertise and personal drive are always the most important qualities. If you can bring that, this could be your chance to make history with us.

We currently have an exciting opportunity for a number of Planners based in our offices in Scotstoun & Bristol. The primary function of this role is to take the lead in creating and maintaining project plans for new programmes and/or restructuring existing project plans following major change, including baselining/rebaselining. Operating in this capacity will require the individual to act as adviser to, and deputise for the Project Planning Manager. In addition, the post holder will be responsible for the governance, guidance and tuition of other members of the project planning team, in all topics associated with project planning, including toolset functionality and capability.

As Lead Planner your main responsibilities will involve:
  • Construct high-level plans to satisfy the programmedeclared cardinal dates
  • Breakdown/partition the high level plans , as definition is made available , maintaining the declared key dates , to produce integrated lower-level plans consistent with the lifecycle stage of the programme.
  •  
  • Advise on the structuring of, and implement, a workable WBS and OBS within the programme plans in line with company procedures
  • Assign budget allocation to high or low level plans, as directed, via WBS, Control Accounts and Work Packages
  • In consultation with the Project Risk Team, produce a sub-set of the lower level plan(s) to support running of the various TRA models
  • Ensure rapid response to problems/issues so that disruption to planned activities is minimised
  • Provide training and/or guidance to other team members and Detail Planners
  • Assist in the PDR process for Project Planners and Trainee Project Planners (objectives & performance)
  • Act for the Project Planning function at selected meetings and in-house planning initiatives

Apply Online - https://baesystems.taleo.net/careersection/2/jobdetail.ftl?lang=en_gb&job=00019107

As a Lead Planner your skills and qualifications will ideally include:

  • Qualified to NVQ / APMP or equivalent
  • Project Controls & Planning experience essential  
  • Lifecycle awareness
  • Project Management Awareness
  • Project Controls Toolsets
  • Primavera & P6 experience essential

Salary

Up to £41k per annum

Apply Online - https://baesystems.taleo.net/careersection/2/jobdetail.ftl?lang=en_gb&job=00019107

BAE Systems Maritime - Naval Ships encompasses complex ship design, build and combat systems capability for the surface fleet.

We design and build a full range of naval ships, giving customers the capability to fulfil extensive naval operations.  We also develop and integrate state of the art combat systems for the surface fleet, equipping customers with the best possible information to operate effectively in modern naval environments.

We offer a wealth of challenging career options; join us as a Lead Planner and you’ll quickly become involved in the delivery of complex engineering programmes, from offshore patrol vessels through to giant aircraft carriers.

Inspired work. It brings us together.

BAE Systems welcomes applications from all sections of the community...http://www.linkedin.com/company/bae-systems/careers

Apply Online - https://baesystems.taleo.net/careersection/2/jobdetail.ftl?lang=en_gb&job=00019107