Skip to content

This job expired 12 years ago and is kept for reference.

Permanent Employment

Commissioning and Start-up - Planner/Scheduler - Horizon Oil ASnds

Canadian Natural Resources Limited · Alberta (NA.CA.AL)

Posted by Horizon Careers · 1 views

Job type
Permanent Employment
Industry
Oil / Gas / Power
Region
Alberta (NA.CA.AL)
Closing date
6 Mar 2014

YOUR OPPORTUNITY:
The Planner/Scheduler is a key player in establishing and maintaining various scheduling tools including Master Schedules, CPM networks, manpower reporting and progress measurement systems. Reporting to the Lead, Integrated Schedule and Reporting, you will work on extremely high-budget and high-profile projects, taking a hands-on role in schedule development, maintenance and monitoring activities to support project objectives.

This position is based in Calgary, Alberta and is eligible for:
• Relocation to Calgary

COMPETITIVE SALARY - STOCK OPTIONS - STOCK SAVINGS PLAN - ANNUAL BONUSES - BENEFITS - LOCATION PREMIUMS -RELOCATION - FLY IN/FLY OUT AND CAMP PROGRAM!

HOW WILL YOU MAKE YOUR MARK?
• Prepare and maintain the Project Master Schedule, Plant Master Schedules, and various Area Coordination Schedules for the project under the direct supervision of other team members
• Prepare schedules for the Commissioning and Start-up
• Monitor, review and analyze the schedule and status of our contractors during all phases of the project, including any schedule deviations and corrective actions
• Assist in Progress Reporting, including Earned Value Analysis, Performance Factor Calculation, establishment of Construction logic
• Develop contractor schedules and collaborate with contractor to ensure plans are realistic and achievable
• Summarize monthly progress information, manpower and commodity by rolling up contractor data
• Review and analyze contractor progress information to ensure their systems and procedures are effective and make sure contractor provides accurate and timely reporting
• Support the Project Manager and Project team with all progress and scheduling issues
• Analyze the schedule, progress and manpower data and make recommendations for corrective action
• Prepare Area coordination schedules
• Assist in ad hoc project work

Temporary Assignment Details 
Location: Horizon Oil Sands site 70 Km outside of Fort McMurray, Alberta
When: Timeline to be determined based on business needs
Duration: Timeline to be determined based on business needs
Shift Schedule: Timeline to be determined based on business needs
Accommodations: Company provided accommodations on site

QUALIFICATIONS: 
• Typically 15+ years of related industry experience with an Engineering Degree or other Technical designation
• Familiarity with and understanding of:
o Proven experience in commissioning and start-up 
o Experience working in an oil sands, mining, refining or petrochemical environment
o Industry specific applications such as Primavera P3ec and Microsoft Office Suite
o Project/Business Management principles and concepts 

To see related Project Control roles at CNRL, visit: www.cnrl-careers.com/jobs/Project-Control


Our Oil Sands Mining Operations
Horizon Oil Sands is a world class asset offering countless opportunities to advance your career. Comprised of surface oil sands mining and bitumen upgrading facilities, this vast project offers challenging opportunities in an environment where teamwork, innovation, and your expertise are valued. Apply your abilities using industry leading technologies and contribute to the success of the Horizon Oil Sands.

About Canadian Natural 
At Canadian Natural, we strive to live through our mission statement: "To develop people to work together to create value for the Company's shareholders by doing it right with fun and integrity." As a leading oil and gas producer, our diverse combination of assets include light oil, heavy oil, in situ oil sands production, oil sands mining and upgrading facilities, and natural gas. At Canadian Natural, safety is a core value. We conduct all of our operations in a way that identifies, minimizes and mitigates harm to the health and safety of employees, contractors, the public and the environment.
 

Stay Updated!
Learn more about what we offer on our Candidate Information Center, find out where our recruiters will be next on theEvents Page, and sign up for job alerts to receive a notification when a new job that matches your profile becomes available! You can also follow us on LinkedIn, Twitter, and YouTube.

Canadian Natural Resources Limited - CNRL - is a publicly traded company on the TSX and NYSE as CNQ.