This job expired 12 years ago and is kept for reference.
SBM Offshore is currently seeking a Sr. Planner Scheduler with Oil & Gas project experience
SBM Offshore · Texas (NA.US.TX)
Posted by admin · 1 views
- Job type
- Permanent Employment
- Industry
- Oil / Gas / Power
- Region
- Texas (NA.US.TX)
- Salary
- Competetive
- Closing date
- 26 Apr 2014
SBM Offshore owns and operates the world’s largest fleet of FPSOs which recently achieved more than 1 million barrels of oil per day throughput.
SBM Offshore’s global footprint includes 7 execution centers worldwide.
We are proud of our technological innovation, and are a market leader in R&D and technology development. Some of SBM Offshore’s products include FPSOs, Turret Mooring Systems, CALM buoys, TLPs, and Semisubmersibles.
SBM Offshore is currently seeking a Sr. Planner Scheduler with Oil & Gas project experience.
Position will be located in the Houston, Texas, USA execution center for SBM Offshore.
The Planner Scheduler will:
- Develop a computerized Resource Loaded CPM Network Schedule for assigned complex projects that meets requirements of contract and project manager
- Define an appropriate detailed WBS (work breakdown structure) for projects, and report deviations to appropriate cost control group and project manager
- Report and trend progress utilizing reporting templates (i.e. curves, tables and customized reports)
- Update the CPM Network as required on a timely basis
- Perform Risk Schedule Analysis as required
- Participate in new work process tools to enhance the Project Controls deliverables
- Provide Planning support to Proposals Group and Feed Studies as needed
- Provide training and assistance to junior level planners as needed
- Participate and provide input to enhance and improve department functions, work procedures and instructions
- Work to standardize schedules
Qualified candidates will possess a Bachelor’s Degree, however lesser qualifications can be compensated by extensive experience. In addition, candidates should possess 10 years of relevant experience in the oil & gas industry. Specific job experience in Floating Production, Storage and Off Loading (FPSO’s) is preferable. Planners must be proficient in Primavera (P6) and MS Project planning software and MS Office.
Interested candidates please submit your CV’s to: David.Sweeten@sbmoffshore.com