This job expired 12 years ago and is kept for reference.
Planner/Scheduler - Horizon Oil Sands
Canadian Natural Resources Limited · Alberta (NA.CA.AL)
Posted by Horizon Careers · 1 views
- Job type
- Permanent Employment
- Industry
- Oil / Gas / Power
- Region
- Alberta (NA.CA.AL)
- Closing date
- 19 Jun 2014
YOUR OPPORTUNITY:
The Planner/Scheduler will play a fundamental role in our growth strategy. Working on extremely high-budget and high-profile projects, you will take a hands-on role in schedule development, maintenance and monitoring activities to support project objectives. You will be responsible for the consolidation of project information from all projects to maintain consistency in our project control processes.
This position is based in Calgary, Alberta and is eligible for:
• Relocation to Calgary
COMPETITIVE SALARY - STOCK OPTIONS - STOCK SAVINGS PLAN - ANNUAL BONUSES - BENEFITS - RELOCATION
HOW WILL YOU MAKE YOUR MARK?
• Monitor and maintain consistency in planner/scheduler processes, detail and content of plans
• Consolidate project information
• Provide reporting information for project with respect to planning
• Conduct all initial work on new projects until assignment is made to planner/scheduler
• Assist in the preparation of schedules for commissioning, start-up, shutdown and tie-in
• Prepare area coordination schedules as required
• Summarize monthly progress, manpower and commodity information by rolling up contract data
• Review and analyze contractor progress information to ensure their systems and procedures are effective and ensure contractor provides accurate and timely reporting
• Support the Project Manager and Project Team on all progress and scheduling issues
• Analyze schedule, progress and manpower data; consolidate information and review procedures and processes taken
• Review and assist in developing contractor schedules and work with contractor to ensure plans are realistic and achievable
Temporary Assignment Details
Location: Horizon Oil Sands site 70 km outside of Fort McMurray, Alberta
When: Timeline to be determined based on business needs
Duration: Timeline to be determined based on business needs
Shift Schedule: To be determined based on business needs
Accommodations: company provided accommodations
QUALIFICATIONS:
• Typically 12+ years of related construction and/or engineering expertise with Engineering Degree or related technical designation
• Registration or eligibility for registration with APEGA preferred
• Familiarity with and understanding of:
o Primavera P6
o Microsoft Office Suite
o Project/business management principles and concepts
Our Oil Sands Mining Operations
Horizon Oil Sands is a world class asset offering countless opportunities to advance your career. Comprised of surface oil sands mining and bitumen upgrading facilities, this vast project offers challenging opportunities in an environment where teamwork, innovation, and your expertise are valued. Apply your abilities using industry leading technologies and contribute to the success of the Horizon Oil Sands.
About Canadian Natural
At Canadian Natural, we strive to live through our mission statement: "To develop people to work together to create value for the Company's shareholders by doing it right with fun and integrity." As a leading oil and gas producer, our diverse combination of assets include light oil, heavy oil, in situ oil sands production, oil sands mining and upgrading facilities, and natural gas. At Canadian Natural, safety is a core value. We conduct all of our operations in a way that identifies, minimizes and mitigates harm to the health and safety of employees, contractors, the public and the environment.
Canadian Natural Resources Limited - CNRL - is a publicly traded company on the TSX and NYSE as CNQ.
Apply Now! www.cnrl-careers.com/jobs/Project-Control