Skip to content

This job expired 11 years ago and is kept for reference.

Contract or Permanent

Delay Analysts – London

Systech International · London (EU.UK.LON)

Posted by Adam Chick · 1 views

Job type
Contract or Permanent
Industry
Forensic Claims
Region
London (EU.UK.LON)
Closing date
11 Aug 2015

 

Are you an experienced planner interested in working alongside some of the industry’s best talent? Systech continue to grow and have a number of exciting opportunities partnering with the leading main contractors.

 

We are currently developing and expanding our planning division and have a number of opportunities for Claims Planners to join our team based in London and the South East.

 

To be considered you will be Degree educated with a minimum 8 years experience within a Planning role along with a proven ability to produce delay analysis reports and a history of acting as a lead in a client facing role, structured around disputes.

You will also;

  • Come from a construction background, working to or having a professional qualification such as CIOB
  • Have excellent communication and organisational skills to be able to impart programme information to all Team members
  • Be able to guide and lead more junior planners
  • Be able to work on own initiative or as part of a team
  • Be flexible in respect of work location and travelling/lodging requirements
  • Have the ability to work indefinitely in the UK and hold all required work permits
  • Proficient in the use of the main construction planning software packages (Power Project, Primavera, MS Project)

Responsibilities:

  • Identification of the planned programme and critical path(s)
  • Establishing provisions in the contract for submission and approval of
  • Programmes
  • Linkage to sub-contract programmes
  • Preparation of progress reports
  • Preparation and maintenance of as built records to establish start/finish dates, intermittent working, accurate progress
  • Supporting extension of time applications, awards and basis assessment.
  • Preparation of delay analysis using accepted techniques

Systech International is expanding in the UK, France and Canada and we are seeking individuals with main contractor experience who would be interested in joining our consultancy team to work on a variety of challenging and high profile projects.

 

If you wish to be considered for this current vacancy then please apply with your detailed CV/Resume to richard.dumper@systech-int.com quoting reference: DPLAN15C

Similar jobs

  1. LondonPermanent EmploymentCivil / Building / E&M
    £120,000