Skip to content

This job expired 9 years ago and is kept for reference.

Permanent Employment

Regional Planner / Scheduler, 4+ years of exp, South Florida, Reston VA (Washington DC), Ft. Worth Texas

Planning Planet · Florida (NA.US.FL)

Posted by admin · 1 views

Job type
Permanent Employment
Industry
Civil / Building / E&M
Region
Florida (NA.US.FL)
Salary
Negotiable
Closing date
17 Jan 2017

DPR Construction, an ENR top 20 General Contractor with offices across the United States is seeking agional Planner/Scheduler with a minimum of at least 4+ years of experience. Current positions available are: South Florida, Reston 

VA (Washington DC), Ft. Worth Texas. Some travel will be involved.

Scheduling will be of commercial projects within our core markets: Healthcare, Advanced Technology, Life Sciences, Corporate Office and Higher Education. Schedulers will work closely with Project Executive’s, Project Manager’s, and Superintendents and will be responsible for the following:

  • Mastery of Primavera P6 v7: Schedule Analysis, Variance reports, Resource/Cost loading, etc.
  • Mastery of Lean scheduling /tools and techniques.
  • Conduct Master Planning sessions with the Project Teams, Owner, Arch, Eng, GC and subcontractors.
  • Lead and support short interval planning (SIP), i.e. pull planning, phase planning and weekly work planning. Utilize a SIP tool such as BIM 360 Plan and use PPC and roadblock metrics.
  • Motivating and lead teams through Lean planning exercises.
  • Ability to “VE” a schedule to its shortest responsible duration.
  • Ability to analyze acceleration options (multiple shifts, Weekday OT, Weekend OT) to recommend the best cost option and offsetting against risks with different approaches.
  • Schedule in Design/Build, IPD or Lump Sum environments.
  • Visiting projects throughout the region to drive consistency on practices and presentation.
  • Train Project teams on all scheduling best practices.

We are looking for a flexible, detail-oriented team player with the ability to manage multiple tasks, produce quality work, and consistently meet deadlines. The successful candidate will possess:

  • Experience in construction of a variety of projects, with demonstrated knowledge of basic construction methods and organization. Understand how complicated systems go together in order to properly sequence detailed activities and to creatively re-sequence a schedule when conflicts arise.
  • Experience must include demonstrated ability to plan, organize, direct, and develop schedules for varied projects and programs, preferably in a construction setting.
  • Experience with delay claims and time extension requests and familiarity with various types of schedule analysis. Understand the risk management end of schedule management.
  • Excellent listening skills and have strong communication skills and the ability to train team members.
  • Computer Skills: Proficient in working with p6 Primavera and in Microsoft Office Suite.
  • 4+ years of experience as a Project Scheduler, preferably within DPR’s Core Market projects.
  • A strong work ethic and a “can-do” attitude.

Additional skills desired:

  • 4-D: Integrate schedules with BIM models.
  • Bachelor’s degree in Construction Management, Engineering, or related field.

Please contact Larry Amboy – larrya@dpr.com or (760) 420-3851

Only individuals with current work authorization for the USA need apply.

Similar jobs

  1. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  2. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  3. LondonPermanent EmploymentCivil / Building / E&M
    £120,000