Skip to content

This job expired 9 years ago and is kept for reference.

Contract or Permanent

Primavera / ASTA Senior Planner (Build Specialist), Tax Free Salary PLUS full expatriate package

Pyramid Recruitment Project Services · United Arab Emirates (AS.AE)

Posted by David Logie · 1 views

Job type
Contract or Permanent
Industry
Civil / Building / E&M
Region
United Arab Emirates (AS.AE)
Salary
Tax Free Salary PLUS full expatriate package
Closing date
6 Jul 2017

No. 2 Senior Planning Engineer (Build Specialist)

Contract: Project Services 
Type: Permanent 
Location: Mediterranean Or Abu Dhabi 
Salary: Tax Free Salary PLUS full expatriate package (accommodation, Car, flights, medical, child allowances etc) paid on top

Pyramid Recruitment is working with a global contracting client in the Middle East whom is urgently seeking a Senior Planning Engineer that has a contracting background to join their team on a major Build construction projects worldwide. Based in the Middle East or Mediterranean offering tax free packages.

RESPONSIBILITIES:

·Planning and scheduling the project by developing a project master schedule in line with the proposal requirements through the application of the Primavera / ASTA software

·Identifying the project deliverable’s, milestones, and required tasks and targets to determine the staffing requirements and allotment of available resources to various phases of the project through the project measurement system

·Implementing the work schedule and monitoring progress of the work for timely execution of the project through daily/weekly/monthly reports

·Monitoring the progress of specific projects on a regular basis. Anticipating and resolving any problems, bottlenecks/scheduling conflicts. Preparing and maintaining package work plans and monitoring progress to achieve on time or earlier deliveries to keep the project on schedule

·Coordinating internal project team reviews, including the approval and review of the client’s work schedule, progress measurement and reporting systems. Reviewing status reports, modifying schedules and plans as required and keeping the management and Project Director informed of the progress on a regular basis

·Ensuring the project controls documents such as resource histograms, schedules, reporting systems, material controls systems, etc. are fully developed by the designated personnel and reviewed by construction management and that Engineering and Procurement interfaces are properly addressed

PROFILE:
– European passport required
– 5-10 years of experience in a Planning Engineer role
– Ideally: Degree Educated in Construction/ Engineering or similar (advantageous)
– Must have previous experience of working for contractors
– Candidates must be eligible to live & work in the EU unaided
·Asta Power Project / Primavera

·Interview slots available now

No terminology in this advert is intended to discriminate on the grounds of age, we will gladly accept applications from persons of any age for this role.

Similar jobs

  1. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  2. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  3. LondonPermanent EmploymentCivil / Building / E&M
    £120,000