The latest Acumen blog post walks through a little-known feature in the Acumen Fuse schedule analysis software.  Using the Trace Logic feature you can: 

- Trace logic forwards or backwards from any activity or milestone within the schedule identifying all network paths or only the driving path

- Trace any path, or the driving path, between any two selected activities and/or milestones

- Gain insight into non-critical paths which could become critical 

Read the full blog post here: http://www.projectacumen.com/tracing-project-logic/ 