Skip to content

BIM/EIM Model D&E Information Schematic

Peter HolroydMember for 21 years 4 months
Created
0
9
0

Hi, has anybody got a pretty schematic showing the D&E interfaces between the 3D BIM Model LOD's as BS 19650, the Vendor information requirements (as set out in the PO's,  we used to have Stages A - G designations) and the 30% / 60% / 95% Design Reviews requirements. If it shows the HAZOP's as well even better.

Replies

Oldest first

No replies yet. Be the first to answer.

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?