Create SubTask and show version and change log
In the Open Standard
Andrea CruzMember for 16 years 10 months
- Created
- 3
- 3
0
I would like to create subtask and for each subtask I want to show the version and the features and bugs.
Task SoftwareName_X
v.1.0 v. 1.2 v.1.3 v.1.4
---- --- - --- -----
(each (---) is the bar shape where bar shape is in the same line and bar text above bar shape )
Task SoftwareName _Y
v.5.0 v. 5.2 v.5.3 v.5.4
---- -- --- -----
And for each task one information about the version like features and bugs.
Someone knows if it is possible?
Thanks in advance,
Andrea Cruz.
PS: Sorry about my English. I am brazilian.
Task SoftwareName_X
v.1.0 v. 1.2 v.1.3 v.1.4
---- --- - --- -----
(each (---) is the bar shape where bar shape is in the same line and bar text above bar shape )
Task SoftwareName _Y
v.5.0 v. 5.2 v.5.3 v.5.4
---- -- --- -----
And for each task one information about the version like features and bugs.
Someone knows if it is possible?
Thanks in advance,
Andrea Cruz.
PS: Sorry about my English. I am brazilian.
3 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?