dear all
how to filter the actiivtes which is scheduled only in the night shift.
i have taken the calendar as 24/7.
so now i have to assign the activites which is starting in the night shift to the night supervisor.
what is the parameter in the filter to be selected.
thank you.
how to filter the actiivtes which is scheduled only in the night shift.
i have taken the calendar as 24/7.
so now i have to assign the activites which is starting in the night shift to the night supervisor.
what is the parameter in the filter to be selected.
thank you.