Resource Critical Path
In the Open Standard
Nozar NaghaniMember for 22 years 3 months
- Created
- 1
- 2
0
I remember once "Vladimir Liberzon" referred to "resource critical path" or "resource constrained floats".
I am trying to use it with Theory of constraints in a design case.
Does anybody (especially Vladimir) want to share some papers/links about RESOURCE CRITICAL PATH?
Good to have them in the forum, so everybody can find/use them in future.
Thanks
Nozar
I am trying to use it with Theory of constraints in a design case.
Does anybody (especially Vladimir) want to share some papers/links about RESOURCE CRITICAL PATH?
Good to have them in the forum, so everybody can find/use them in future.
Thanks
Nozar
1 reply