Iftikhar Awan P.Eng.Member for 20 years 4 months
Created
2
2
0
Hello all.

I am a new member of this planet!

Does anyone know how I can get a trial version of Primavera 5.0 ? I checked the primavera website but could not find any.

Thanks.

2 replies

Oldest first
  1. 0
    Steve Keys ·
    Primavera typically does not provide trial software for downloading. However, you may be able to work with a local PAR in your area to undertake some form of evaluation.

    Proji-Contrôle, Inc
    Address: 127 Barr Street St. Laurent
    Quebec H4T 1W6
    Country: Canada

    Contact Name: Dan Boyd
    Phone: +514.735.3843
    Fax: +514.735.2987
    Email: sales@projicontrole.com
    Web Site: http://www.projicontrole.com

  2. 0
    Iftikhar Awan P.Eng. ·
    Thank you Steve, for the information. I would be getting in touch with the rep.

    I had found limited version of Suretrak 3.0 on Primavera website and was hoping that I might be able to get Primavera 5.0 similarly. Primavera 5.0 or probably Primavera Enterprise was available for sometime in the past on the primavera website, as told by a colleague. I guess I got late.

    Thanks again.