P5-Top Down Estimation!
In the Open Standard
Suraj BhattMember for 22 years 4 months
- Created
- 1
- 2
0
Hi!
I have a basic schedule with 4 levels of WBS.The activities in the 4th level are repetitive i.e. they repeat in each 4th level.
I wish to put the total resource for the 3rd level and use top down estimation to distribute it as per the activity duration.
E.g. If total resource for the 3rd level is 1500
I want TDE to distribute this 1500 into the lower WBS activity based on the activity durations.
Is this possible???
Thanks in advance
Regards
Suraj
I have a basic schedule with 4 levels of WBS.The activities in the 4th level are repetitive i.e. they repeat in each 4th level.
I wish to put the total resource for the 3rd level and use top down estimation to distribute it as per the activity duration.
E.g. If total resource for the 3rd level is 1500
I want TDE to distribute this 1500 into the lower WBS activity based on the activity durations.
Is this possible???
Thanks in advance
Regards
Suraj
1 reply
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?