CVRJC-3802-1 error when importing XER file.
In the Open Standard
Andrew PodolnyMember for 21 years 11 months
- Created
- 7
- 2
0
For those who have error when importing XER file into P5:
CVRJC-3802-1 TCCustomVirtualRow.getJoinedColItems: UDFVALUE row has blank fk_id
In connection to the previous thread http://www.planningplanet.com/forum/forum_post.asp?fid=1&Cat=8&Top=30489&page=3
I’ve wrote a small utility to fix the structure of XER file and I’d like to share it.
The utility can be downloaded here:
http://rapidshare.com/files/33950874/_xer.exe
Please check that your workstation has Microsoft .NET Framework version 2 installed.
It’s easy to verify – just go to your Windows\ Microsoft.NET\Framework\ folder and check the subfolders.
If you have something like this:
c:\WINDOWS\Microsoft.NET\Framework\v2.0.50727\ - everything is ok. If not – go there and download the Framework from Microsoft site.
http://www.microsoft.com/downloads/details.aspx?FamilyID=0856eacb-4362-4b0d-8edd-aab15c5e04f5&displaylang=en
Install the Framework then run _xer.exe again.
Your comments and suggestions will be highly appreciated.
Regards,
Andrew
CVRJC-3802-1 TCCustomVirtualRow.getJoinedColItems: UDFVALUE row has blank fk_id
In connection to the previous thread http://www.planningplanet.com/forum/forum_post.asp?fid=1&Cat=8&Top=30489&page=3
I’ve wrote a small utility to fix the structure of XER file and I’d like to share it.
The utility can be downloaded here:
http://rapidshare.com/files/33950874/_xer.exe
Please check that your workstation has Microsoft .NET Framework version 2 installed.
It’s easy to verify – just go to your Windows\ Microsoft.NET\Framework\ folder and check the subfolders.
If you have something like this:
c:\WINDOWS\Microsoft.NET\Framework\v2.0.50727\ - everything is ok. If not – go there and download the Framework from Microsoft site.
http://www.microsoft.com/downloads/details.aspx?FamilyID=0856eacb-4362-4b0d-8edd-aab15c5e04f5&displaylang=en
Install the Framework then run _xer.exe again.
Your comments and suggestions will be highly appreciated.
Regards,
Andrew
7 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?