P6 S Curve
In the Open Standard
Benjamin MoraMember for 19 years
- Created
- 4
- 2
0
You folks are the smart ones, so I figured I’d ask the following:
I have a cost loaded schedule in P6, but I cannot figure out how to create a S Curve using the P6 Report Wizard. I know it can be done in Excell. Can anyone walk me through this. Thank you in advance.
I have a cost loaded schedule in P6, but I cannot figure out how to create a S Curve using the P6 Report Wizard. I know it can be done in Excell. Can anyone walk me through this. Thank you in advance.
4 replies