Primavera P5 standalone installation

Muhammad FiazMember for 18 years 2 months
Created
7
6
0
I am installaing Primavera P5 standalone on my computer with windows XP but during database configuration it fails to configure MSDE server.How do i deal with this problem.Will somebody suggest.
Thanks,

7 replies

Oldest first
  1. 0
    Dieter Wambach ·
    Muhammad
    In PP you can find some threads on this topic. P5 cannot be installed under XP. You’ll have to upgrade to P6.
    Regards
    Dieter
  2. 0
    Ronald Winter ·
    Dieter,

    I believe that you meant to say that P5 cannot be installed under Vista operating system. My P5 ran well on my XP computer.
  3. 0
    Dieter Wambach ·
    Thanks Ronald
    Absolutely correct! P5 works under XP and NOT under Vista.
    Regards
    Dieter
  4. 0
    Dieter Wambach ·
    Muhammed
    Obviously It was too early for me in the morning and I didn’t read your question correctly. Sorry.
    Possible reason 1: You need local Admin rights on your pc and don’t have them. Easiest way to check: Right click onto the start button. If the bottom line of the new window is "Explorer All Users" you have them.
    Possible reason 2: It seems that there is a conflict with an older version of MS SQL Server. Check if it is still required. If not, deinstall - don’t forget to check the registry - and try to install P5 again..
    Regards
    Dieter
  5. 0
    Muhammad Fiaz ·
    Dieter:
    Thanks for your time and mail. I disabled Firewall and successfully installed satndalone P5 and now running it.
  6. 0
    Bipresh Paul ·
    Same probs happens with me, I could not install P5 neither in Vista noe in XP. ne1 for help??
  7. 0
    Alexandre Faulx-Briole ·
    Paul,
    please be more specific!
    Alexandre