Activity Code vs User Defined Field
In the Open Standard
Sandy MathesonMember for 22 years
- Created
- 8
- 2
0
It is possible to assign ’code’ values to activities either through ’Activity Code’ or using ’User Defined’ fields. I find User Defined easier to work with as the codes do not need to be pre-defined and when assigning codes the system does not continually refer to a code library to verify exisitence. What are the drawbacks from using the ’User Defined’ field.