Guys
can any body help Me

I have installed Primavera® P6™ Integration API 6.2
how to configure the Database
it ask
user name = ??
Password = ??

Database name = What is the database name for stand alone
Database host addres =??
Database host Port=?? ( 1433 was default)
SSL =??
public Group =1

3 replies

Oldest first
  1. 0
    Arnold Puy ·
    Hi Milind,

    It is a stand-alone installation?



  2. 0
    Milind Pandhare ·
    i am unable to configure
    i dont know the CODES
    i.e hostname etc etc
  3. 0
    Dieter Wambach ·
    Milind

    API is a programmers’ interface to the Primavera database and requires some knowledge about relational databases. If this knowledge is missing, it’s usage will be very dangerous for your installation and your data.
    Do you know the SQL Server Management Studio? Did you study the API Admin Guide?

    Without this knowledge in my opinion it’s better not to install the API.

    Dieter