Renumber Activity ID’s
In the Open Standard
Ruel CamaquinMember for 17 years 11 months
- Created
- 2
- 1
0
Guys,
How i hate this upgrade! how can i totally disable this new feature of P6.7? It really annoys me when i have to manually rename or renumber my activity id’s after copying the same group of activities (typical works).
If i have an activity like drywall partition on one floor that has a typical or same scope on another floor. Before 6.7, in 6.2 if i copy the same activity the same activity prefix and the suffix will just be incremented by 10 or by what ever default placed-in (i.e. dry001 after copying will just be simply dry002). But in 6.7, it just goes like this if i copy an activity with an id like dry001 it will turn out as a1001. So it is really annoying to use copy- paste function.
If there’s a walk around to totally disable the "renumber activity id’s" it will surely be a lot of help.
thanks.
How i hate this upgrade! how can i totally disable this new feature of P6.7? It really annoys me when i have to manually rename or renumber my activity id’s after copying the same group of activities (typical works).
If i have an activity like drywall partition on one floor that has a typical or same scope on another floor. Before 6.7, in 6.2 if i copy the same activity the same activity prefix and the suffix will just be incremented by 10 or by what ever default placed-in (i.e. dry001 after copying will just be simply dry002). But in 6.7, it just goes like this if i copy an activity with an id like dry001 it will turn out as a1001. So it is really annoying to use copy- paste function.
If there’s a walk around to totally disable the "renumber activity id’s" it will surely be a lot of help.
thanks.
2 replies
Oldest firstLog in or join to reply