Cost Control using P6

Aqil MahmoodMember for 21 years 1 month
Created
0
4
0

Hi Guys

is it possible to carry out detailed cost control/monitoring on a project using P6 software alone? simply we need to know the budgeted cost (as per our estimate/bid) Vs Actual cost spent at any instant of time.

Actually i tried it in the following manner but stuck at a point

1. Loaded the baseline program with budgeted resources same as per estimate/bid, unit rates, quantities

2. Then updated manually on daily basis the actual consumption of resouces (manpower,equipment,material) on site in P6.

3. But how to update the actual cost in P6? We have budgeted unit rates for the resources in the resource dictionary but where to feed actual unit rates for the same resource ? can we have two different unit rates for one resource ?

 

has any body done this on any project.

 

I would be very thankful if any expert can guide me through this or any alternate method for carrying out cost monitoring/control using P6.

 

Many Thanks in advance

 

Aqil

Abu Dhabi

UAE

00971508341670

Replies

Oldest first

No replies yet. Be the first to answer.

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?