Primavera Problems: Loading issues

Tony HughesMember for 23 years 4 months
Created
10
5
0

I have P6 stand alone application on my laptop,

Recently its taking 20 mins to load after signing in, and then around 20 minutes to load each project

 

Before i fire the laptop through the nearest window is there anyone out there who would know what the problem is and can they give a step by step guide to fixing this problem

 

Don't suggest going to Primavera / Oracle im still waiting on them to get back to me about a problem i reported in June 10

 

Regards

 

Tony

10 replies

Oldest first
  1. 0
    David Kelly ·

    If you are running using SQL

    If you are running using SQL express as a database, then it is probably "tired". I reckon every 6 months I need to save all the projects and layouts I need, and delete the P6 local database on my laptopn and reload it.  SQL express "wears out" just like windows.

  2. 0
    Rafael Davila ·

    Tired database,  ....Then SQL

    Tired database,  ....

    HA HA

    Then SQL express is a toy, not a surprise but amazing. Should provide better re-indexing tools.

  3. 0
    Rockzy Sales ·

    Hi, are you using P6.0 on

    Hi,

     

    are you using P6.0 on Win7?

     

    I had the same problem before, so what I did is to Install another OS, an older one, which is the WinXP...and this is where I installed my P6.0

     

    anyway.... it could also be that your laptop is being swarmed by Viruses... ;-)

     

     

    Cheers,

    the Rock

  4. 0
    Ronald Winter ·

    Tony,   You need to tell us

    Tony,

     

    You need to tell us your P6 Version Number.  Version 5 had a problem where the Admin needed to manually purge deletes.  Version 6 definitely had problems running background services that would perform this task for you.  Another possibility might be corrupt databases.  Try Check Project Integrity.  Good luck!

  5. 0
    Tony Hughes ·

    Hi Ronald, I am using

    Hi Ronald,

     

    I am using primavera 6 .2

    Reinstalled the software and still getting the same problems

  6. 0
    Tony Hughes ·

    Hi Ronald, I am using

    Hi Ronald,

     

    I am using primavera 6 .2

    Reinstalled the software and still getting the same problems

  7. 0
    Tony Hughes ·

    Cheers,Yes i am using MSql

    Cheers,

    Yes i am using MSql Express on a windows vista OS.

    The laptop is virus free, i ended up doing a full factory restore a few weeks ago as i thought this might have been the problem

  8. 0
    Tony Hughes ·

    Cheers,Yes i am using MSql

    Cheers,

    Yes i am using MSql Express on a windows vista OS.

    The laptop is virus free, i ended up doing a full factory restore a few weeks ago as i thought this might have been the problem

  9. 0
    Ronald Winter ·

    First you need to check the

    First you need to check the database integrity ( Tools / Check Project Integrity ).  Then you should confirm that your background services are scheduled and being run.  (Windows Start Button / Microsoft SQL Server 2005 / SQL Server Manager SQL Express ).  Then you need to drop-kick your Vista OS and upgrade to 32-bit Windows 7 as fast as you can.  If I were you, I would also upgrade to P6 Version 7.  If this does not work, you will be forced to fix it the old fashion way; call a local Primavera Provider and schedule a repair appointment.  Good luck!

  10. 0
    Kas DaAce ·

    Sounds like your database has

    Sounds like your database has become corrupted. You can do a total reinstall of the database after backing it up or if I were you and this will be a recurring issue, I would install the Oracle 10g desktop database. It is more reliable than MS SQL and to me faster and more friendly with indexing.

    http://www.oracle.com/technetwork/database/express-edition/overview/index.html

     

    Regards,

    Kas