Laptop technical specification for P6

Miguel CostaMember for 20 years 6 months
Created
9
43
0

Hi,

 

What should be the technical specification for using P6.2 (standa alone mode) in a laptop.

Amount of memory, processor,...

Thanks,

Miguel

9 replies

Oldest first
  1. 0
    Rafael Davila ·

    http://www.planningplanet.com

    http://www.planningplanet.com/forums/primavera-version-pm5-pm6/499754/primavera-p6-release-8

    Better get 1 Terabyte of RAM, this is memory hungry and getting hungrier. Soon 999 GB will not be enough.

  2. 0
    Raymund de Laza ·

    Hi Rafael, I am wondering why

    Hi Rafael,

    I am wondering why in Laptop a Large number of activites is getting slower to open compared to PC with the same Project to open.

    Any Hints?

     

    regards,

  3. 0
    Rafael Davila ·

    Raymund,Try re-indexing your

     

    Raymund,

    Try re-indexing your database. Look for the procedure that fits your database selection and let all know if it works, I am sure many will be grateful.

    It seems to be a problem common of databases stored in a single huge file, but I am not an expert as I do not use software with such issues.

    Best Regards,

    Rafael

  4. 0
    Raymund de Laza ·

    Rafael, Thanks for the

    Rafael,

    Thanks for the reply...

    As I noted on the task Manager PM.exe *32 is running... while my laptop is Win7 64 bit.... meaning P6 32 bit is running on a 64 bit OS?

    This could be a cause of it?

     

    Regards,

  5. 0
    Rafael Davila ·

    I guess it might be a

    I guess it might be a possible cause, operating system has to do with accessible/usable RAM it is not necessarily that your computer has it. Believe 32 bit is limited to access 4 MB RAM while 64 is substantially more.

    If you open a single job you should not notice the difference, unless very big, in such case I believe other issue shall be the cause.

    How big is your job that is so slow?

    A fully resource and cost loaded 120,000 activities CPM  shall load in about 5 seconds and shall save in about the same amount of time.

    http://www.youtube.com/watch?v=Me31jP_n3dE

    I have a 32bit OS with 3G RAM' perhaps average by today standards.

  6. 0
    Raymund de Laza ·

    Hi Rafael, I have 64bit win7

    Hi Rafael,

    I have 64bit win7 4G RAM. Only 10,000 activities with activity codes loaded. Resources are not yet loaded and it will takes 20-30 mins to open. While opening the same project in a desktop pc using a 32bit win7 2GB RAM, it wil take just seconds.

     

    Hope to have my problem resolves soon.

     

     

    Regards,

     

  7. 0
    Rafael Davila ·

    Raymund,Perhaps because you

    Raymund,

    Perhaps because you are using, unnecesarily, a monstruous data base even opening a single job will take long if re-indexing is past due.

    One approach can be to create several separate data bases and use a few jobs per database. Try with just a couple of jobs without deleting from original database.

    I dont't believe the issue will solve by itself, no harm doing some trials until someone hits the answer.

    Regards,

    Rafael

  8. 0
    Raymund de Laza ·

    Thanks alot for the advice

    Thanks alot for the advice Rafael.

     

    Regards,

  9. 0
    Miguel Costa ·

    I’m going to ask, something

    I’m going to ask, something with a minimum 2gb of memory, for the processor at lest 2mb cache.

     

    Thanks all for the inputs.

     

    Cheers,

    Miguel