Event Code: AVAAO-3660-0
In the Open Standard
Dan CowenMember for 9 years 9 months
- Created
- 1
- 1
0
While importing an xer file an event code was displayed (AVAAO-3660-0) and I was unable to complete the import. When I ran the exception report the message stated that it was "Access violation at address 00B09AOE in module 'PM.exe'" what do I need to do to be able to import this file?
1 reply