S Curve From P6 Cost Integration
- Created
- 3
- 5
I am aware there is ample information out there to create an S Curve via P6 without entering total manpower for each task (I do not know how to currently do this, but will do the research to save people from having to post informaiton that is already out there). What I cant seem to find is if I can enter project cost into P6 if I don't tasks #'s assigned to each cost line item. For example, if task 10 in my schedule is "Abatement", in excel do I have to add a column that labels abatement as task 10?
Long story short: I have a project scheudle in P6, I have a detail cost matrix in excel (which does not specifcially reference the P6 schedule), and I want to link both to an S curve. What is the easiest method to get there?
Thanks, and I apologize in advacne if my question is confusing.
3 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?