Hierarchical coding structure
In the Open Standard
Kevin RaynerMember for 17 years 9 months
- Created
- 2
- 3
0
I have set up a hierarchical project code so I can group geographically rather tahn use the cost driven WBS. However when I pull up the project code as a column I can't populate it.
When I select the blank field I expect to be abe to see the structure, as with the wbs but it is blank. All filters are off.
What am I doing wrong?
2 replies
Oldest firstLog in or join to reply