Primavera P6 R16.2 EAccessViolation SQLServer
In the Open Standard
Mayi ArceMember for 7 years 11 months
- Created
- 3
- 3
0
Hello
I´m installed Primavera P6 16.2 with SQLServer 2012. When I try to open the BD in SQLite its works ok, but when I try to open the BD created througth the intaller dbsetup.bat, I received the error Exception EAccessviolation in module PM.exe.
Please, I need some suggestion. SOS
3 replies
Oldest firstLog in or join to reply