WBS description into Activity Description- Global change
In the Open Standard
Rajkamal TangiralaMember for 16 years 6 months
- Created
- 5
- 4
0
Hi,
I am generating a engineering schedule. Our Client has asked to present schedule that it lists the control gates under each WBS.
I have listed the Deliverables at WBS level and would like to have the WBS name concatnated with the Activity Description.
For EX. P&IDs -- WBS Level
P&IDs - IFR - Activity Level
P&IDs - Receive Comments - Activity Level so on for other control gate
the reason behind is without the description makes it difficult for sequencing.
Can some one guide me how this can acheived if possible.
Thanks in Advance,
Rajkamal