Sorting Activity Code groupings by the start date of the activities within
- Created
- 2
- 36
I have created a view which has two levels of activity codes - Example (for illustration only) level 1: Building and level 2: Work Type. This is not the WBS. Using grouping and sort I selected the two levels and checked the box to "show summaries only". When I view the result I am looking at the summary bars at Work Type level for each building.
The problem is that the work type is not always consistent e.g. if it was: 1. Under Ground services - 2. foundations - 3. framing - 4. roof- 5. Paving; I could set my activity codes in that order. However this not always consistent in this project example the Underground services can be performed after the building construction or maybe the paving is performed after underground services but before foundations and so I need to sort the activity codes by the start dates of the activities within that activity code grouping.
How can I achieve this.
Thanks
2 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?