Relation between Detailed eng. and Basic eng.
In the Open Standard
Carmen ArapeMember for 22 years 3 months
- Created
- 4
- 3
0
Hi Planners,
Is it true that the relation between Detailed eng. and Basic Eng. is 1.5 in terms of duration.?????
For instance, 9 months for Basic Eng., therefore I can assume 14 months for Detailed Eng. based on this factor.
p.s: please think that everything goes well with vendor drawings and the interface with detailed design.
Thanks&Cheers,
carmen