Output Rates

Toby HuntMember for 19 years 2 months
Created
0
3
0
Dear All

I am trying to obtain details of outputs for works in Saudi Arabia (which can be used to prepare and substantiate the project programme) for the following activities:

Piling (each)
Concrete (m3)
Heavy Structural Steel (Tn)
Light Structural Steel (Tn)
Prefab Piping >2” (pulgadas soldadura)
Erection Piping >2” (Tn)
Erection Piping <2” (Tn)
Prefab Large Bore Hangers >2” (Tn)
Erection Large Bore Hangers >2” (Tn)
Cable Laying (ml)
Hydrotesting (Num de Circuitos)
Loop Tests
Insulation – Tanks (m2)
Insulation – Equipment (m2)
Insulation – Piping (ml)

I realise that the list is fairly generic (what sort of piles ? what sort of insulation ?), but does anyone know where I can perhaps find a range of items within the generic description?

Many thanks

Toby

Replies

Oldest first

No replies yet. Be the first to answer.

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?