Lack of mentoring!!!
In the Open Standard
Ian MackrellMember for 18 years 9 months
- Created
- 8
- 3
0
Hello there
As a relative youngster in the nuclear industry i have made the leap into planning from a mechanical engineer. The company i work for are on the thin side of good planners engineers and are helping me to become one.
However, the mentoring side is small to none with only one guy left within the firm (who is close to retirement)and believe i am being thrown on the wrong path at times.
I believe there is alot of ’re-inventing the wheel’ as the ’older’ generation are taking their knowledge to the grave.
I feel disheartened and frustrated to be watched by others who know but don’t show!
Does anyone else feel the same or is it the company i work for and should be looking elsewhere? be honest please!
As a relative youngster in the nuclear industry i have made the leap into planning from a mechanical engineer. The company i work for are on the thin side of good planners engineers and are helping me to become one.
However, the mentoring side is small to none with only one guy left within the firm (who is close to retirement)and believe i am being thrown on the wrong path at times.
I believe there is alot of ’re-inventing the wheel’ as the ’older’ generation are taking their knowledge to the grave.
I feel disheartened and frustrated to be watched by others who know but don’t show!
Does anyone else feel the same or is it the company i work for and should be looking elsewhere? be honest please!
8 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?