what is standard for creating any equipment house schedule
- Created
- 0
- 2
Hi all
I want to create a schedule for compressor House in which there is five same type of compressor, gear box, motor, silenser, mist eliminator, lub oil system, Motor cooling hydraulic system exist.
according to me
Process : 1. Craete PFD & PID
Equipment : 1. compressor, base plate, silecer, mist eliminator PDS (process data sheet) .EOT Crane
2. Technacil spec for same
3. detailing for same
Electrical
Load list
cable rack, cable schedule, cable trench, detailing
Instrument
Instrument data sheet for Control valve, other instrumnet,
Technical specification for instrument, Control cale scheduling, cable trench
Piping
Piping layout, piping Isometric
Structural
Compressor house shed
detail for EOT crane Support
Combined load data (static & dynamic) for civil drawing
Civil
Piping layout, Foundation detail, Foundation bolt detail.
i have give some measure activity can any one give the detail of the schedule.
Regards\\
Replies
Oldest firstNo replies yet. Be the first to answer.
Log in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?