Retained Logic & Progress Override

Tanveer Ahmad NiaziMember for 20 years 10 months
Created
3
2
0

Hi all planners,

I was studying Retained Logic and Progress Override options in P6. And understood well about Retained Logic also I understood that the result under Progress Override are not realistic. Then, the question raised that if the results are not realistic then why this option is there in the P6?, also what is the difference between “Retained Logic” and “Actual Dates” I am sure there lot of experienced planners who can satisfy me.

Cheers

3 replies

Oldest first
  1. 0
    Ronald Winter ·

    Tanveer,  If you will look to

    Tanveer,

     If you will look to the right of your screen at the top, you will see a section titled, “More Like This”.  Click on any of the suggested links to answer your questions.  Good luck!

  2. 0
    Tanveer Ahmad Niazi ·

    Hi,Thanx Mr. Ronald Winter, I

    Hi,

    Thanx Mr. Ronald Winter, I got that and I think there is a lot of stuff for me.

    Cheers

  3. 0
    Tanveer Ahmad Niazi ·

    Thanx Mr. Ronald Winterfor

    Thanx Mr. Ronald Winterfor your reference, I studied the threads and the articles referred. It’s  now  pretty much clear to me that where and when should I use the option of “Progress Override” but I think I need some practice to get the complete sense of it. Thanx again