E&M / Building Services Production Rate
In the Open Standard
Ernani GarenaMember for 13 years 9 months
- Created
- 0
- 2
0
I need the assistance of E&M Planning Engineers about the Building Services Production Rate in Underground Station Works as:
1. Ducting Installation - linear meter / day
2. Fire Sprinkler Pipe Installation - linear meter / day
3. Cold Water Pipe Installation - linear meter / day
4. Electrical Conduit Installation - linear meter / day
5. Electrical Cable Tray Installation - linear meter / day
Thank you very much for those who will respond to my request!