High Rise Building Schedule
- Created
- 10
- 3
hi there
is there any one share some of his best experience for high rise building project schedule any pdf or XER will really help
or can you please give list of activities for one typical floor with or without duration
you can send me the info as email on tumharabina@yahoo.com
thanks in Advanced
M
10 replies
Oldest first- 0RDRaymund de Laza ·
Hi,There are high rise
Hi,
There are high rise building such as Water Tank Tower with a revolving Restaurant on Top, Guard House Tower Building around a perimeter fence of a Military Compound, Tower buildings such as in Dubai.
The list of activities depends on what is required by the Contract Project.
Regards,
- 0GWGary Whitehead ·
Muhammad, Most people on this
Muhammad,
Most people on this forum don't share their programmes.
I personally never do, because I feel the programmes I create are the property of my client, and not mine to share.
Other people never do becuase they feel it is giving away their experience for free, when they normally charge for it.
Others don't because they feel it is helping someone who doesn't know how to do their job to stay in a job which they don't deserve.
Some people do share their work but not many, so don't be annoyed or suprised if you don't get what you are looking for.
- 0MZMuhammad Zeeshan Khan ·
Gary its a shame that people
Gary its a shame that people dont help each other i am not ask for the programme i am just asking for the list of activities
List of activities does not belongs to any programme and it is always good to share your experience and best practices you have used.
Those who not share are mostly P6 jockey and I appreciate and salute all those project professional who are helping planning community without thinking about doesn't know how to do their job to stay in a job which they don't deserve,feel it is giving away their experience for free" they all are mean little buggers and they should not be on this forum
Cheers
- 0JPJohn Peter ·
Muhammad you are absolutely
Muhammad you are absolutely right this forum is made to help all planners in our community.
People like Gary don’t understand this. Most of the planners who write that sort of comments spend most of their office time on internet and rest of the time doing some design plans for desktop surveys.
If you don’t have any knowledge how do you share something!!! But can give loads of lame excuses.
I hope this example help you. Most people in this forum share their experience because they have knowledge
Activity Name Original Duration Remaining Duration Start Finish Total Float City Center Office Building Addition 681 554 01-Nov-10 A 3-Jul-13 0 Design and Engineering 107 0 01-Nov-10 A 06-Apr-11 A Design Building Addition 55 0 01-Nov-10 A 19-Jan-11 A Start Office Building Addition Project 0 0 01-Nov-10 A Review and Approve Designs 22 0 17-Jan-11 A 17-Feb-11 A Assemble Technical Data for Heat Pump 7 0 16-Feb-11 A 25-Feb-11 A Review Technical Data on Heat Pumps 27 0 24-Feb-11 A 06-Apr-11 A Foundation 146 98 23-Feb-11 A 19-Sep-11 175 Begin Building Construction 0 0 28-Feb-11 A Site Preparation 43 0 23-Feb-11 A 18-Apr-11 A Excavation 24 24 2-May-11 6-Jun-11 127 Install Underground Water Lines 12 12 3-Jun-11 21-Jun-11 127 Install Underground Electric Conduit 12 12 3-Jun-11 21-Jun-11 127 Form/Pour Concrete Footings 24 24 21-Jun-11 26-Jul-11 127 Concrete Foundation Walls 24 24 25-Jul-11 26-Aug-11 127 Form and Pour Slab 12 12 26-Aug-11 14-Sep-11 127 Backfill and Compact Walls 5 5 13-Sep-11 19-Sep-11 127 Foundation Phase Complete 0 0 19-Sep-11 178 Structure 151 151 19-Sep-11 20-Apr-12 306 Erect Structural Frame 48 48 19-Sep-11 25-Nov-11 127 Begin Structural Phase 0 0 25-Nov-11 418 Floor Decking 34 34 25-Nov-11 13-Jan-12 127 Concrete First Floor 36 36 11-Jan-12 1-Mar-12 127 Erect Stairwell and Elevator Walls 24 24 1-Mar-12 4-Apr-12 139 Concrete Basement Slab 24 24 1-Mar-12 4-Apr-12 139 Concrete Second Floor 36 36 1-Mar-12 20-Apr-12 127 Structure Complete 0 0 20-Apr-12 127 Mechanical/Electrical Systems 562 549 14-Apr-11 A 26-Jun-13 0 Rough-In Phase Begins 0 0 12-Mar-12 234 Rough In Complete 0 0 5-Feb-13 0 Elevator 218 218 4-Apr-12 12-Feb-13 90 Install Elevator Rails and Equipment 3 3 4-Apr-12 6-Apr-12 217 Install Elevator Cab and Finishes 5 5 5-Feb-13 12-Feb-13 91 HVAC 562 549 14-Apr-11 A 26-Jun-13 0 Prepare and Solicit Bids for Heat Pump 15 2 14-Apr-11 A 4-May-11 0 Review Bids for Heat Pump 10 10 4-May-11 17-May-11 0 Award Contract for Heat Pump 6 6 17-May-11 25-May-11 0 Fabricate and Deliver Heat Pump and Controls 422 422 25-May-11 23-Jan-13 0 Install HVAC Ducts 24 24 12-Mar-12 13-Apr-12 186 Insulate Ducts 5 5 18-Jun-12 25-Jun-12 140 Set Heat Pump 12 12 4-Jan-13 22-Jan-13 0 Relocate HVAC Chiller 7 7 22-Jan-13 1-Feb-13 0 Startup and Test HVAC 2 2 1-Feb-13 5-Feb-13 0 Install AC Grills and Registers 5 5 8-Apr-13 15-Apr-13 23 Test and Balance HVAC Equipment 2 2 21-Jun-13 26-Jun-13 0 Plumbing and Electrical 258 258 20-Jan-12 23-Jan-13 6 Set Mechanical and Electrical Equipment 36 36 20-Jan-12 12-Mar-12 186 Rough-In Plumbing/Piping 3 3 24-Aug-12 29-Aug-12 72 Install Wiring and Cable 36 36 31-Aug-12 23-Oct-12 72 Connect Equipment 1 1 22-Jan-13 23-Jan-13 6 Exterior Finishes 336 289 17-Feb-11 A 19-Jun-12 266 Close-In Phase Begins 0 0 15-May-12 296 Building Enclosed 0 0 18-Jun-12 127 Brick 312 265 17-Feb-11 A 15-May-12 124 Assemble Brick Samples 0 0 17-Feb-11 A Review and Approve Brick Samples 30 0 28-Feb-11 A 13-Apr-11 A Prepare and Solicit Bids for Brick Exterior 15 0 18-Mar-11 A 13-Apr-11 A Review Bids for Brick 15 0 08-Apr-11 A 28-Apr-11 A Award Contract for Brick 5 4 21-Apr-11 A 5-May-11 377 Deliver Brick 1 1 5-May-11 6-May-11 377 Brick Exterior Walls 17 17 20-Apr-12 15-May-12 127 Roof 24 24 15-May-12 19-Jun-12 124 Insulation and Built-up Roofing 24 24 15-May-12 19-Jun-12 127 Doors and Windows 7 7 27-Apr-12 8-May-12 152 Install Door and Window Frames 3 3 27-Apr-12 1-May-12 156 Install Exterior Doors and Windows 5 5 1-May-12 8-May-12 156 Interior Finishes 601 554 25-Feb-11 A 3-Jul-13 0 Drywall in Offices 36 36 5-Feb-13 27-Mar-13 0 Touch-up and Clean-up 2 2 19-Jun-13 24-Jun-13 0 Finishes Complete 0 0 26-Jun-13 0 Punch List 5 5 26-Jun-13 3-Jul-13 0 Building Addition Complete 0 0 3-Jul-13 0 Plumbing and Lighting Fixtures 44 44 8-Apr-13 10-Jun-13 7 Install Lighting Fixtures 7 7 8-Apr-13 17-Apr-13 21 Install Plumbing Fixtures 5 5 3-Jun-13 10-Jun-13 7 Floor and Carpeting 581 534 25-Feb-11 A 4-Jun-13 0 Assemble and Submit Flooring Samples 0 0 25-Feb-11 A Review and Approve Flooring 28 0 25-Feb-11 A 11-Apr-11 A Prepare and Solicit Bids for Flooring 24 5 04-Apr-11 A 6-May-11 231 Review Bids for Flooring 15 15 6-May-11 27-May-11 231 Award Contract for Flooring 5 5 27-May-11 6-Jun-11 231 Fabricate and Deliver Flooring 279 279 3-Jun-11 6-Jul-12 231 Install Floor and Carpeting 12 12 16-May-13 4-Jun-13 0 Carpentry 59 59 27-Mar-13 19-Jun-13 0 Install Ceiling Grid 36 36 27-Mar-13 16-May-13 0 Finish Carpentry and Millwork 12 12 3-Jun-13 19-Jun-13 0 Paint 12 12 14-Feb-13 4-Mar-13 76 Paint Building Interior 12 12 14-Feb-13 4-Mar-13 77 - 0RDRaymund de Laza ·
Activity NameOriginal
Activity Name Original Duration Design and Engineering 51 Design Building Addition 23 Design 43 Review and Approve Designs 9 Assemble Technical Data for Heat Pump 3 Review Technical Data on Heat Pumps 8 Procurement 132 Prepare and Solicit Bids for Heat Pump 10 Review Bids 10 Prepare and Solicit Bids for Flooring 5 Review Bids for Heat Pump 2 Review Bids for Flooring 3 Award Contract for Heat Pump 10 Review Bids for Brick 3 Award Contract for Flooring 1 Award Contract for Brick 2 Fabricate and Deliver Flooring 58 Deliver Brick 58 Fabricate and Deliver Heat Pump and Controls 88 Sitework 114 Site work I 50 Sitework 95 Site work II 45 Foundation 79 Foundation 64 Excavation 24 Begin Building Construction 0 Excavation 10 Form Work 12 Install Underground Water Lines 5 Install Storm water lines 10 Concrete 79 Site Preparation 10 Form/Pour Concrete Footings 10 Concrete Foundation Walls 14 Form and Pour Slab 10 Backfill and Compact Walls 5 Foundation Phase Complete 0 Structure 172 Structure 143 Erect Structural Frame 40 Begin Structural Phase 0 Floor Decking 28 Concrete First Floor 60 Erect Stairwell and Elevator Walls 10 Concrete Basement Slab 15 Concrete Second Floor 15 Mechanical/Electrical Systems 133 Rough-In Phase Begins 0 Rough In Complete 0 Elevator 165 Elevator 138 Install Elevator Rails and Equipment 40 Install Elevator Cab and Finishes 20 Plumbing and Electrical 181 Set Mechanical and Electrical Equipment 15 Electrical Costs 152 Rough-In Plumbing/Piping 45 Install Wiring and Cable 45 Connect Equipment 3 HVAC 186 HVAC, Plumbing & Fire Protection 155 Install HVAC Ducts 25 Insulate Ducts 2 Set Heat Pump 5 Relocate HVAC Chiller 3 Startup and Test HVAC 1 Install AC Grills and Registers 5 Test and Balance HVAC Equipment 1 Exterior Finishes 278 Exterior Finish Costs 205 Brick 266 Assemble Brick Samples 3 Review and Approve Brick Samples 10 Brick Exterior Walls 14 Roof 10 Insulation and Built-up Roofing 10 Doors and Windows 3 Install Door and Window Frames 1 Install Exterior Doors and Windows 2 Interior Finishes 373 Drywall in Offices 15 Interior Finish Costs 44 Finishes Phase Begins 0 Finishes Milestone 0 Touch-up and Clean-up 1 Building Addition Complete 0 Punch List 2 Plumbing and Lighting Fixtures 17 Install Lighting Fixtures 3 Install Plumbing Fixtures 2 Floor and Carpeting 362 Assemble and Submit Flooring Samples 8 Review and Approve Flooring 10 Install Floor and Carpeting 5 Carpentry 30 Install Ceiling Grid 15 Finish Carpentry and Millwork 5 Paint 36 Paint Building Interior 30