Baseline submission to Client
- Created
- 13
- 3
Hi all,
I have a question.
In the Contractor's submitted baseline schedule to a Client, the Client planning enginner found that the design review by the Client (Engineer) is in the critical path of the project. How should he respond to it?
For eg: the sequence as; Design documents submittal (Contractor)-Design review(Client)- Design approval-Shop drawings /method statement preparation-major civil foundation construction-major equipment/mep works-commissioning-Completion
Is it allowed to have the client review in the critical path, or the Contractor is making it for some future claims?.
Thanks
Best Regards
Kannan
13 replies
Oldest firstLog in or join to reply