MEP Sequence
In the Open Standard
Project PlannerMember for 12 years 6 months
- Created
- 3
- 1
0
I need the sequence of work and relationship for the following Electrical activities
| Embedded Conduiting in the Floor Slab |
| Conduiting in Blockworks |
| Installation of Trunking |
| Install Cable Tray |
| Wiring for Lighting |
| Wiring for Power |
| Wiring for Fire Alarm |
| Wiring for Emergency Lighting System |
| Dressing & Termination of Fire Alarm |
| Wiring for IP CCTV |
| Dressing & Termination of Emergency Lighting |
| Wiring for SMATV System |
| Dressing & Termination of SMATV |
| Wiring for Structured Cabling |
| Wirng for BMS |
| Dressing & Termination of Structured Cabling |
| Dressing & Termination of BMS |
| Dressing & Termination of CCTV |
| Uninteruptable Power Supply (UPS) |
| Central Battery System |
| Installation of BMS |
Thanks in advance
3 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?