Delay Analyis

Mohamed BscengMember for 10 years 6 months
Created
5
3
0

Can anyone share with me free studying material to understand the different methods of delay analysis?

5 replies

Oldest first
  1. 0
    Rafael Davila ·

    Construction Delay Analysis

    Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs

    It is noteworthy that the need for analysts to take resource allocations into account in their delay analyses is becoming an increasingly vital requirement. For instance, in the UK case of McAlpine Humberoak vrs McDermott International [29], the judge disapproved of the plaintiff’s delay claim submissions on the basis of not giving consideration on how resource usage was planned for and how they were actually utilized during construction. Wickwire [43] also reviewed legal decisions in the US and noted that “in any analysis of project delays, the contractor is required to take into account realistic resource leveling”.

    Schedule Analysis under the Effect of Resource Allocation (PDF)

    Schedule Float Game ENR

  2. 0
    Zoltan Palffy ·

    look at AACE Best Practice No

    look at AACE Best Practice No 29R-02 Forenesic Analsis

    and

    AACE Best Practice Time Impact Analysis 52R-06

  3. 0
    Samy Hassanin ·

    look at this

    look at this presentation 

     

    https://www.linkedin.com/posts/%D8%B9%D9%84%D9%85-%D9%8A%D9%86%D8%AA%D9%81%D8%B9-%D8%A8%D9%87_schedule-claims-analysis-toolbox-activity-6711613678791233536-pScX

  4. 0
    Brian Walkin ·

    How about the documentation

    How about the documentation of the delay in the schedule as it occurs - delay activities. Is there a recomended practice for this?

  5. 0
    Brian Walkin ·

    How about best practice for

    How about best practice for documenting delays in the schedule as activities and or notbook entries. Is there are accepted best practace / documents on this.

     