P3 access from asp or coldfusion page
In the Open Standard
Forum GuestMember for 17 years 8 months
- Created
- 2
- 1
0
Hi,
I am creating a small web report application which shows all the p3 data in web page. I have successfully installed ODBC driver(od32v204.exe). I managed to link the P3 tables into MS Access(2000) DB. Does anyone succeeded in creating a ASP or Coldfusion page which retrives the data from P3 via ODBC?.
Thanks in advance.
I am creating a small web report application which shows all the p3 data in web page. I have successfully installed ODBC driver(od32v204.exe). I managed to link the P3 tables into MS Access(2000) DB. Does anyone succeeded in creating a ASP or Coldfusion page which retrives the data from P3 via ODBC?.
Thanks in advance.