Actual Progress Percentage
In the Open Standard
Rajeev KumarMember for 23 years 5 months
- Created
- 2
- 2
0
what is the best way to find/calculate actual percentage? I could use planned percentage as the time percentage completed of the target project. but for calculating the actual percentage, is it absolutely necessary that i input all resources and track them(input actual resource usage data). i guess thats a tedious task especially when you are reporting weekly for a large project(4000 activities). further if such a thing is possible, can i show both these percentages on the bars and get some meaningful inference?
My project is an electrical one, where we are required to wire, install panels, terminate(connect), label wires, label panels, install sockets, outlets, detectors and finally commission etc. i have now inputed manpower in it, but that does not give a correct picture of the progess.
folks, any help is appreciated.
Thanx for listening.
My project is an electrical one, where we are required to wire, install panels, terminate(connect), label wires, label panels, install sockets, outlets, detectors and finally commission etc. i have now inputed manpower in it, but that does not give a correct picture of the progess.
folks, any help is appreciated.
Thanx for listening.
2 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?