P3 to Excel conversion

Doug NortonMember for 22 years 4 months
Created
2
1
0
Need instruction on converting P3 to Excel and back again.
Also S curve in P3 with bar chart.
ttereve91@yahoo.com

2 replies

Oldest first
  1. 0
    Mk Tse ·
    By RA, which is available in CD, can export P3 into Excel format.
    The revised data in Excel can be imported back to P3.
  2. 0
    Luca Basile ·
    To make the s-curve in P3, with the bar chart, use the View->Resource profile (CTRL+F7) option.
    Then in the window select the resource You want to show in Your gph, as well as the display option.
    To have it print, in page set up You have to flag in the “Resource/Cost display”

    To exchange info between P3 and excel You can also do in other two way:
    - importing and exporting the information You need;
    - Using the ODBC driver capability.
    Over the RA engine as per mktse post.



    I hope is what You were looking for.