P3 and windows XP incompatibilities

Luca BasileMember for 23 years 3 months
Created
2
1
0
I bought a new laptop with windows XP home SP1.
I installed P3 Ver 3.1 and service pack 2.
I am now facing with the following problem.
When I want to take out a relationship the minus
bottom in the relationship window is not working.

Have any other faced with the same problem?
How did You solved it?

2 replies

Oldest first
  1. 0
    Mk Tse ·
    If uninstall SP2, do you have same problem?
  2. 0
    Luca Basile ·
    Yeah.
    First I tried without SP2, then with SP2.
    After one day of error and trial I found out that all the mouse are working properly (also with all the other application) except with the remove predecessor and successor bottom.
    I sent on Friday evening to primavera the problem, I am now waiting their reply.
    I will post it as far as I will got it.

    Thanks.
    Luca