When I try to launch P3 I get the following error.
"P3 for Windows requires at least Btrieve version 6.15. An earlier version is currently in use or was detected. Close other Btrieve applications and re-run P3. The version currently loaded is located in the C:\WINDOWS\system directory."
This issue has accured on several computers where I have tried to install P3. Does anybody have experience with this issue?
"P3 for Windows requires at least Btrieve version 6.15. An earlier version is currently in use or was detected. Close other Btrieve applications and re-run P3. The version currently loaded is located in the C:\WINDOWS\system directory."
This issue has accured on several computers where I have tried to install P3. Does anybody have experience with this issue?
5 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?